Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Rocher Noir

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Les Menuires 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Rocher Noir 
Type 3-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1979 
Commissioning date 1979 
Date of closing down 2020 
Date of pull down 2021 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1650 m
Height of mountain station 2209 m
Vertical rise 559 m
Route distance 1567 m
Horizontal length ?? m
Average incline 39 %
Largest incline 62 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 11,25 min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 163 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? FRF
Currency (Construction costs) French franc 
Construction period ?? months
Seasontime ??  
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/12/22
PHOTOS: ??

Lift-Statistics
10992 visit(s) since 27/11/05
Last visit 23/12/24

LIFT-WORLD IDs
Lift-ID: 8490
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/8490/datas.htm