Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

 Celliers


Height of valley station: ?? m
Travel time: 2,67 min
Height of mountain station: ?? m
Driving speed line: 5,0 m/s
Route distance: 804 m
Maximum capacity: 700 Pers/h
Year of construction: 2008 
Lift manufacturer: Poma 
Seasontime: ??
 



Height of valley station: 1310 m
Travel time: ?? min
Height of mountain station: 1407 m
Driving speed line: 3,0 m/s
Route distance: 352 m
Maximum capacity: 640 Pers/h
Year of construction: 1969 
Lift manufacturer: Poma 
Seasontime: ??
 

Places within a radius
  Moûtiers
  Notre-Dame-du-Pré
  Meribel
  La Tania
  Méribel-Mottaret
  La Plagne-Montalbert


Support
Wrong data or something is missing?
Support us!
LIFT-WORLD IDs
Place-ID: 983