Lift-Database » Lifts in the world
Malcesine
Height of valley station: 99 m
Travel time: 3,5 min
Height of mountain station: 562 m
Driving speed line: 10,0 m/s
Route distance: 1512 m
Maximum capacity: 600 Pers/h
Year of construction: 2002
Lift manufacturer: Hölzl
Seasontime: ❄ ☀
Height of valley station: 562 m
Travel time: 6,8 min
Height of mountain station: 1749 m
Driving speed line: 8,0 m/s
Route distance: 2813 m
Maximum capacity: 600 Pers/h
Year of construction: 2002
Lift manufacturer: Hölzl
Seasontime: ❄ ☀
Height of valley station: 106 m
Travel time: ?? min
Height of mountain station: 572 m
Driving speed line: ?? m/s
Route distance: 1508 m
Maximum capacity: 300 Pers/h
Year of construction: 1962
Lift manufacturer: ??
Seasontime: ??
Height of valley station: 570 m
Travel time: ?? min
Height of mountain station: 1757 m
Driving speed line: ?? m/s
Route distance: 2818 m
Maximum capacity: 200 Pers/h
Year of construction: 1962
Lift manufacturer: Ceretti Tanfani
Seasontime: ??
LIFT-WORLD IDs
Place-ID: 1463
Place-ID: 1463