Lift-Database » Lifts in the world
4-CLF Almes
Valley Station
Line
Mountain Station
General information | |
---|---|
Place | Tignes |
resort | Espace Killy |
Region | Rhône-Alpes |
Country | |
Name of lift | Almes |
Type | 4-CLF |
Lift manufacturer | GMM |
Year of construction | 2016 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | 2092 m |
Height of mountain station | 2275 m |
Vertical rise | 183 m |
Route distance | 573 m |
Horizontal length | 542 m |
Average incline | 33,76 % |
Largest incline | 40 % |
Number of pillars | 7 Stk |
Greatest spanwidth | 128 m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,7 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2100 Pers/h |
Travel time | 4,55 min |
Driving speed line | 2,1 m/s |
electrical data | |
---|---|
Electrical control | SEIREL |
Remote control and telemonitoring system | SEIREL |
Power control system | SEIREL |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Montaz Mautino |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 82 Stk |
Cab distance | 14,4 m |
Cab interval | 6,85 s |
rope data | |
---|---|
Rope manufacturer | ArcelorMittal |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 40,5 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 18/05/20
PHOTOS: ??
Lift-Statistics
2818 visit(s) since 05/05/20
Last visit 23/11/24
LIFT-WORLD IDs
Lift-ID: 19683
Place-ID: 1227
https://www.seilbahntechnik.net/en/lifts/19683/datas.htm
Datas: 18/05/20
PHOTOS: ??
Lift-Statistics
2818 visit(s) since 05/05/20
Last visit 23/11/24
LIFT-WORLD IDs
Lift-ID: 19683
Place-ID: 1227
https://www.seilbahntechnik.net/en/lifts/19683/datas.htm