Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Almes

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Tignes 
resort Espace Killy 
Region Rhône-Alpes 
Country   
Name of lift Almes 
Type 4-CLF 
Lift manufacturer GMM 
Year of construction 2016 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2092 m
Height of mountain station 2275 m
Vertical rise 183 m
Route distance 573 m
Horizontal length 542 m
Average incline 33,76 %
Largest incline 40 %
Number of pillars 7 Stk
Greatest spanwidth 128 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,7 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2100 Pers/h
Travel time 4,55 min
Driving speed line 2,1 m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system SEIREL 
Power control system SEIREL 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 82 Stk
Cab distance 14,4 m
Cab interval 6,85 s


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40,5 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/05/20
PHOTOS: ??

Lift-Statistics
2815 visit(s) since 05/05/20
Last visit 22/11/24

LIFT-WORLD IDs
Lift-ID: 19683
Place-ID: 1227

https://www.seilbahntechnik.net/en/lifts/19683/datas.htm