Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Easter

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Kimberley 
resort ?? 
Region British Columbia 
Country   
Name of lift Easter 
Type 3-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1975/10 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Centrepole Chairs Replaced with Chairs from Nakiska's Old Gold Chair

geometric data  
Height of valley station 1616 m
Height of middle station(s) ?? m
Height of mountain station 1982 m
Vertical rise 366 m
Route distance 1097 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 7,5 min
Driving speed line 2,54 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type diesel engine 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27 mrt 2025
PHOTOS: ??

Lift-Statistics
3276 visit(s) since 17 okt 2006
Last visit 16 jul 2025

LIFT-WORLD IDs
Lift-ID: 10391
Place-ID: 2729

https://www.seilbahntechnik.net/en/lifts/10391/datas.htm