Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Planai West (Golden JET)


Line
Line

Line
Line





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Schladming
resort Schladming Dachstein Tauern
Ski amadé
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Planai West (Golden JET) 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2006 
Commissioning date 2006

geometric data  
Height of valley station 750 m
Height of middle station(s) 930 m
Height of mountain station 1390 m
Vertical rise 180 / 465 m
Route distance 1062 / 1339 m
Horizontal length ?? m
Average incline 27,27 %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2408 Pers/h
Travel time 2,5 / 4 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1090 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Carvatech
Cab model ULTRA 8 S
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 87 Stk
Cab distance 71,76 m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Evacuation ropeway ??
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/01/20 18:26:43
PHOTOS: 06/02/10 17:48:00

Lift-Statistics
15798 visit(s) since 03/12/06
Last visit 28/05/20

LIFT-WORLD IDs
Lift-ID: 10711
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/10711/datas.htm