Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Hochbrandbahn










General information  
Place Grossarl 
resort ?? 
Region Salzburg 
Country   
Name of lift Hochbrandbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2006 
Commissioning date 2006 
Date of closing down 26/03/23 
Date of pull down 29/03/23 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 893 m
Height of mountain station 1325 m
Vertical rise 432 m
Route distance 1164 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time ?? min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Carvatech 
Cab model ULTRA 8 S 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 42 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/02/24
PHOTOS: ??

Lift-Statistics
23418 visit(s) since 23/12/06
Last visit 18/03/24

LIFT-WORLD IDs
Lift-ID: 10767
Place-ID: 243

https://www.seilbahntechnik.net/en/lifts/10767/datas.htm