Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Chastlatsch



General information  
Place Zuoz 
resort ?? 
Region Grisons 
Country   
Name of lift Chastlatsch 
Type 4-CLF 
Lift manufacturer Garaventa 
Year of construction 2006 
Commissioning date 23/12/06 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Childguard

geometric data  
Height of valley station 1710,9 m
Height of middle station(s) ?? m
Height of mountain station 1899,90 m
Vertical rise 188,05 m
Route distance 928,24 m
Horizontal length 902,69 m
Average incline 20,68 %
Largest incline 75,50 %
Number of pillars 11 Stk
Greatest spanwidth 99 m
Max ground clearance 18 m
Trackwidth drive 4,8 m
Trackwidth line 4,8 m
Trackwidth return 4,8 m
Angle of wrap (drive wheel) 179,1 °
Drive altitude of site 3,5 m
Maximum capacity 900 Pers/h
Travel time 8,63 min
Driving speed line 1,8 m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) 151 kW
Drive power (Operation) 100 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type 4FG 
Cab manufacturer Garaventa 
Cab model 4E98 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 66 Stk
Cab distance 28,48 m
Cab interval 15,82 s


rope data  
Rope manufacturer Fatzer 
Length of haul rope 1880,07 m
Total weight of haul rope 9,64 t
Haul rope diameter 38 mm
Nominal strength of haul rope 1860 N/mm²
Breaking strength of rope 965 kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way 2,5 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/03/23
PHOTOS: ??

Lift-Statistics
5311 visit(s) since 25/12/06
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 10785
Place-ID: 2038

https://www.seilbahntechnik.net/en/lifts/10785/datas.htm