Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Birkhahnbahn

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Galtuer 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Birkhahnbahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1988 
Commissioning date 1988 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1634 m
Height of mountain station 2050 m
Vertical rise 415 m
Route distance 1538 m
Horizontal length ?? m
Average incline 28,4 %
Largest incline 66,6 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2100 Pers/h
Travel time 5,7 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DS 104 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 109 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction ?? 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 4,5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/04/23
PHOTOS: ??

Lift-Statistics
17637 visit(s) since 21/01/04
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 1112
Place-ID: 28

https://www.seilbahntechnik.net/en/lifts/1112/datas.htm