Lift-Database » Lifts in the world
4-CLF Pincerie
Valley Station
Line
Mountain Station
General information | |
---|---|
Place | Les Adrets |
resort | ?? |
Region | Rhône-Alpes |
Country | |
Name of lift | Pincerie |
Type | 4-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 2006 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1450 m |
Height of middle station(s) | ?? m |
Height of mountain station | 1883 m |
Vertical rise | 433 m |
Route distance | 1203 m |
Horizontal length | 1115 m |
Average incline | 39 % |
Largest incline | 74 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 4,8 m |
Trackwidth line | 4,8 m |
Trackwidth return | 4,8 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2200 Pers/h |
Travel time | 8 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | Semer |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 380 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | 4E98 |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 149 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 45 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 50 % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 29/03/24
PHOTOS: ??
Lift-Statistics
7015 visit(s) since 04/05/07
Last visit 22/12/24
LIFT-WORLD IDs
Lift-ID: 11256
Place-ID: 1118
https://www.seilbahntechnik.net/en/lifts/11256/datas.htm
Datas: 29/03/24
PHOTOS: ??
Lift-Statistics
7015 visit(s) since 04/05/07
Last visit 22/12/24
LIFT-WORLD IDs
Lift-ID: 11256
Place-ID: 1118
https://www.seilbahntechnik.net/en/lifts/11256/datas.htm