Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Hochzillertalbahn I

Valley station
Valley station

Line
Line




General information  
Place Kaltenbach 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Hochzillertalbahn I 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 1997 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Hochzillertal II

geometric data  
Height of valley station 561,6 m
Height of mountain station 1059,8 m
Vertical rise 498,2 m
Route distance 1224 m
Horizontal length ?? m
Average incline 44,80 %
Largest incline 65,80 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 3,4 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 773 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model ULTRA 8 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 62 Stk
Cab distance 54 m
Cab interval 9 s
Garage type ground floor 
Garage place valley and middle station(s) 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/06/23
PHOTOS: ??

Lift-Statistics
31727 visit(s) since 23/05/03
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 1138
Place-ID: 148

https://www.seilbahntechnik.net/en/lifts/1138/datas.htm