Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Duez - Le Bâté

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Anzere 
resort ?? 
Region Valais 
Country   
Name of lift Duez - Le Bâté 
Type 2-CLF 
Lift manufacturer von Roll 
Year of construction 1970/87 
Commissioning date ?? 
Date of closing down 06.04.2025 
Date of pull down 2025 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Shared tower with the chairlift "Les Grillesses" (since 2012)

geometric data  
Height of valley station 2120 m
Height of middle station(s) ?? m
Height of mountain station 2420 m
Vertical rise 300 m
Route distance 1067 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 720 Pers/h
Travel time ?? min
Driving speed line ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Loading carpet ?? 
Evacuation ropeway no 
Integrated rescue system ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06.07.2025
PHOTOS: ??

Lift-Statistics
9567 visit(s) since 13.07.2007
Last visit 23.07.2025

LIFT-WORLD IDs
Lift-ID: 11580
Place-ID: 225

https://www.seilbahntechnik.net/en/lifts/11580/datas.htm