Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Campetto – Pré de Veau - Plan Torrette


Line (right one)
Line (right one)

Mountain Station
Mountain Station

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Breuil-Cervinia
resort
Region Valle d'Aosta
Country IT Italy, Italia
Name of lift Campetto – Pré de Veau - Plan Torrette 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2006 
Commissioning date ??

geometric data  
Height of valley station 2488 m
Height of middle station(s) ?? m
Height of mountain station 2950 m
Vertical rise 461,5 m
Route distance 1695 m
Horizontal length ?? m
Average incline 27, %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time ?? min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 680 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour
Seating ??
Seat heater no
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 12/10/15 22:12:06
PHOTOS: 21/03/12 21:28:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8090 visit(s) since 05/08/07
Last visit 23/07/19

LIFT-WORLD IDs
Lift-ID: 11749
Place-ID: 1327

https://www.seilbahntechnik.net/en/lifts/11749/datas.htm