Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Tracouet










General information  
Place Nendaz 
resort Les 4 Vallées 
Region Valais 
Country   
Name of lift Tracouet 
Type 12-MGD 
Lift manufacturer von Roll 
Year of construction 1992 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
The lift had 2 entrances. One at station level at the slope and the other at the ticket office. The gondolas were driven behind with the help of chain conveyors, you could get on and then they were transported up again.
--> see video
This entrance at the ticket office was however dismantled

geometric data  
Height of valley station 1385 m
Height of mountain station 2200 m
Vertical rise 815 m
Route distance 2293 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 8,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 960 kW
Drive power (Operation) 770 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 12 
Number of cabs 52 Stk
Cab distance 120,0 m
Cab interval 24,0 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ??  
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/04/23
PHOTOS: ??

Lift-Statistics
10695 visit(s) since 07/09/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1195
Place-ID: 2034

https://www.seilbahntechnik.net/en/lifts/1195/datas.htm