Lift-Database

Lifts in the world


8-MGD Dorfbahn









Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Brand
resort Brandnertal
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Dorfbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date 2007

geometric data  
Height of valley station 1011 m
Height of mountain station 1402 m
Vertical rise 390,5 m
Route distance 1119,5 m
Horizontal length 1049 m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1695 Pers/h
Travel time 3,2 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 478 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Carvatech
Cab model ULTRA 8 S
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 30 Stk
Cab distance 101,9 m
Cab interval 17,0 s
Garage type station circulation
Garage place valley and mountain
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/02/21 07:54:05
PHOTOS: 31/10/08 23:05:00

Lift-Statistics
24188 visit(s) since 04/10/07
Last visit 04/12/21

LIFT-WORLD IDs
Lift-ID: 12118
Place-ID: 43

https://www.seilbahntechnik.net/en/lifts/12118/datas.htm