Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Hohe Mut II












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Obergurgl
resort Obergurgl-Hochgurgl
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hohe Mut II 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date ??

geometric data  
Height of valley station 2071,60 m
Height of mountain station 2646,50 m
Vertical rise 574,90 m
Route distance 1435 m
Horizontal length ?? m
Average incline 44,1 %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,1 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab
Number of cabs 51 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 29/07/08 21:40:00
PHOTOS: 23/09/08 10:24:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9416 visit(s) since 17/11/07
Last visit 12/11/19

LIFT-WORLD IDs
Lift-ID: 12172
Place-ID: 60

https://www.seilbahntechnik.net/en/lifts/12172/datas.htm