Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD trassXpress












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Zell am See
resort Schmittenhoehe
Region Salzburg
Country AT Austria, Österreich
Name of lift trassXpress 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date 24/11/07

geometric data  
Height of valley station 943 m
Height of mountain station 1901 m
Vertical rise 958 m
Route distance 2847 m
Horizontal length 2674,46 m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 8,95 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater yes
Heater ??
Aircon ??
Persons per cab
Number of cabs 89 Stk
Cab distance ?? m
Cab interval 12 s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) 15 




This information are for members only visible!



Updates
Datas: 27/10/19 12:32:09
PHOTOS: 09/09/08 21:58:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
15372 visit(s) since 18/11/07
Last visit 15/11/19

LIFT-WORLD IDs
Lift-ID: 12176
Place-ID: 252

https://www.seilbahntechnik.net/en/lifts/12176/datas.htm