Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Diasbahn

Valley station
Valley station

Line
Line




General information  
Place Kappl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Diasbahn 
Type 4-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date 1987 


Infos for handicapped persons
no step-free access

Characteristics
nothing

geometric data  
Height of valley station 1175 m
Height of mountain station 1830 m
Vertical rise 655 m
Route distance 1488 m
Horizontal length ?? m
Average incline 48,70 %
Largest incline 75,00 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 5,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 420 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DS 104 
Cab manufacturer Swoboda 
Cab model Austro Panorama 4 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 78 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/03/24
PHOTOS: ??

Lift-Statistics
23697 visit(s) since 29/12/02
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 1243
Place-ID: 10

https://www.seilbahntechnik.net/en/lifts/1243/datas.htm