Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Alblittbahn


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Since 2007 summer operation!

General information  
Place Kappl
resort
Ski Resort Kappl
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Alblittbahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 1998

geometric data  
Height of valley station 1823 m
Height of mountain station 2300 m
Vertical rise 477 m
Route distance 1288 m
Horizontal length ?? m
Average incline 40,20 %
Largest incline 75,00 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 4,8 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Doppelmayr
Cab model 4E98/B
Bubble colour neutral
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 77 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 3,5 months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 01/09/17 20:55:13
PHOTOS: 06/08/06 09:56:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11850 visit(s) since 08/02/03
Last visit 07/12/19

LIFT-WORLD IDs
Lift-ID: 1244
Place-ID: 10

https://www.seilbahntechnik.net/en/lifts/1244/datas.htm