Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Tête des Verds


Valley Station
Valley Station

Valley Station
Valley Station

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Flaine
resort
Region Rhône-Alpes
Country FR France
Name of lift Tête des Verds 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date ??

geometric data  
Height of valley station 1585 m
Height of middle station(s) ?? m
Height of mountain station 2110 m
Vertical rise 525 m
Route distance 1814 m
Horizontal length 1736 m
Average incline 31 %
Largest incline 98 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3100 Pers/h
Travel time 6 min
Driving speed line 5,25 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 890 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A108C
Cab manufacturer Doppelmayr
Cab model 6E98
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 108 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 14/11/09 13:33:00
PHOTOS: 23/09/08 10:26:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6891 visit(s) since 15/01/08
Last visit 13/12/19

LIFT-WORLD IDs
Lift-ID: 12444
Place-ID: 1020

https://www.seilbahntechnik.net/en/lifts/12444/datas.htm