Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Christie Peak Express

Valley Station
Valley Station

Valley Station
Valley Station

Line
Line

General information  
Place Steamboat Springs 
resort Howelsen Hills 
Region Colorado 
Country   
Name of lift Christie Peak Express 
Type 6-CLD 
Lift manufacturer Leitner-Poma 
Year of construction 2007 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
midway loading and unloading

geometric data  
Height of valley station 2096 m
Height of middle station(s) 2167 m
Height of mountain station 2436 m
Vertical rise 71,5 / 340 m
Route distance 547 / 1445,5 m
Horizontal length ?? m
Average incline 13 / 24 %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 5,33 min
Driving speed line 5,08 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type Omega T 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 92 Stk
Cab distance 34,29 m
Cab interval 6,75 s
Garage type emergency rail 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/04/19
PHOTOS: ??

Lift-Statistics
4394 visit(s) since 19/01/08
Last visit 24/11/24

LIFT-WORLD IDs
Lift-ID: 12487
Place-ID: 2505

https://www.seilbahntechnik.net/en/lifts/12487/datas.htm