Lift-Database » Lifts in the world
4-CLD Arven
Line
Line
Mountain station
General information | |
---|---|
Place | Grindelwald |
resort | Jungfrau |
Region | Berne |
Country | |
Name of lift | Arven |
Type | 4-CLD |
Lift manufacturer | von Roll |
Year of construction | 1988 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1849 m |
Height of mountain station | 2072 m |
Vertical rise | 223 m |
Route distance | 985 m |
Horizontal length | ?? m |
Average incline | 21,8 % |
Largest incline | 52,4 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1800 Pers/h |
Travel time | 3 min |
Driving speed line | 5 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | SISAG |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | von Roll |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 58 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | ?? |
Garage place | valley station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 07/10/24
PHOTOS: ??
Lift-Statistics
12130 visit(s) since 12/03/05
Last visit 23/12/24
LIFT-WORLD IDs
Lift-ID: 1287
Place-ID: 1724
https://www.seilbahntechnik.net/en/lifts/1287/datas.htm
Datas: 07/10/24
PHOTOS: ??
Lift-Statistics
12130 visit(s) since 12/03/05
Last visit 23/12/24
LIFT-WORLD IDs
Lift-ID: 1287
Place-ID: 1724
https://www.seilbahntechnik.net/en/lifts/1287/datas.htm