Lift-Database » Lifts in the world
2-CLF Hohe Wand

Line

Valley Station
General information | |
---|---|
Place | Grünbach |
resort | ?? |
Region | Lower Austria |
Country | ![]() |
Name of lift | Hohe Wand |
Type | 2-CLF |
Lift manufacturer | Kienast |
Year of construction | 1965 |
Commissioning date | Aug 14, 1965 |
Date of closing down | 1994 |
Date of pull down | Aug 10, 1994 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 590 m |
Height of mountain station | 1115 m |
Vertical rise | 525 m |
Route distance | 1632 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 19 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 500 Pers/h |
Travel time | 17 min |
Driving speed line | ?? m/s |
electrical data | |
---|---|
Electrical control | AEG |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | gas engine |
Traction of emergency drive | mechanical |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Girak |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 113 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | St. Egydyer |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 31 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | 725,692 kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Autonomous ropeway | no |
Asset number (Trail map) | ?? |
Updates
Datas: Jan 4, 2025
PHOTOS: ??
Lift-Statistics
9134 visit(s) since May 8, 2008
Last visit Jun 29, 2025
LIFT-WORLD IDs
Lift-ID: 12949
Place-ID: 422
https://www.seilbahntechnik.net/en/lifts/12949/datas.htm
Datas: Jan 4, 2025
PHOTOS: ??
Lift-Statistics
9134 visit(s) since May 8, 2008
Last visit Jun 29, 2025
LIFT-WORLD IDs
Lift-ID: 12949
Place-ID: 422
https://www.seilbahntechnik.net/en/lifts/12949/datas.htm