Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Senderbahn II


Mountain Station
Mountain Station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Bad Gastein
resort Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift Senderbahn II 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2008 
Commissioning date ??

geometric data  
Height of valley station 1387,51 m
Height of mountain station 2244,01 m
Vertical rise 856,50 m
Route distance 1975,40 m
Horizontal length 1780,06 m
Average incline 48,12 %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2401 Pers/h
Travel time 5,61 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1081 kW
Drive power (Operation) 902 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A108C
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater yes
Heater ??
Aircon ??
Persons per cab
Number of cabs 64 Stk
Cab distance 71,97 m
Cab interval 11,99 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 29/12/09 21:40:00
PHOTOS: 29/04/09 20:40:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
13108 visit(s) since 01/11/08
Last visit 14/11/19

LIFT-WORLD IDs
Lift-ID: 13259
Place-ID: 246

https://www.seilbahntechnik.net/en/lifts/13259/datas.htm