Lift-Database » Lifts in the world
2-CLF Fedare - Croda Negra



General information | |
---|---|
Place | Colle Santa Lucia |
resort | Dolomiti Superski |
Region | Veneto |
Country | ![]() |
Name of lift | Fedare - Croda Negra |
Type | 2-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 2008 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 2244 m |
Height of middle station(s) | ?? m |
Height of mountain station | 2420 m |
Vertical rise | 176 m |
Route distance | 440,5 m |
Horizontal length | 390,5 m |
Average incline | 45,9 % |
Largest incline | ?? % |
Number of pillars | 6 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,0 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1200 Pers/h |
Travel time | 3,66 min |
Driving speed line | 2,2 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | ?? |
Seat heater | ?? |
Persons per cab | 2 |
Number of cabs | 75 Stk |
Cab distance | 12 m |
Cab interval | 6,0 s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 32 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 3 months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 12/07/23
PHOTOS: ??
Lift-Statistics
14422 visit(s) since 25/11/08
Last visit 22/02/25
LIFT-WORLD IDs
Lift-ID: 13322
Place-ID: 1374
https://www.seilbahntechnik.net/en/lifts/13322/datas.htm
Datas: 12/07/23
PHOTOS: ??
Lift-Statistics
14422 visit(s) since 25/11/08
Last visit 22/02/25
LIFT-WORLD IDs
Lift-ID: 13322
Place-ID: 1374
https://www.seilbahntechnik.net/en/lifts/13322/datas.htm