Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Senderbahn


Line
Line

Mountain Station
Mountain Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Haus im Ennstal
resort Ski amadé
Schladming Dachstein Tauern
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Senderbahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date ??

geometric data  
Height of valley station 1336 m
Height of mountain station 1865 m
Vertical rise 529 m
Route distance 1598 m
Horizontal length ?? m
Average incline ?? %
Largest incline 70,00 %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1590 Pers/h
Travel time 6,11 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 534 kW
Drive power (Operation) 422 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour neutral
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 84 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 19/05/16 22:23:27
PHOTOS: 25/04/09 22:28:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10266 visit(s) since 07/12/02
Last visit 21/10/19

LIFT-WORLD IDs
Lift-ID: 1340
Place-ID: 8

https://www.seilbahntechnik.net/en/lifts/1340/datas.htm