  4-CLD Chaltebrunne - Saanerslochgrat










General information  
Place Saanen 
resort Ablaendschen 
Region Berne 
Country   
Name of lift Chaltebrunne - Saanerslochgrat 
Type 4-CLD 
Lift manufacturer Garaventa 
Year of construction 2008 
Commissioning date 2008 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1683 m
Height of mountain station 1953 m
Vertical rise 270 m
Route distance 681,39 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 (1800) Pers/h
Travel time 2,71 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 203 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 32 (41) Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope 9 t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period 4 months
Seasontime ??  
Situation of entrance 180° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/04/20
PHOTOS: ??

Lift-Statistics
7560 visit(s) since 21/12/08
Last visit 23/12/24

LIFT-WORLD IDs
Lift-ID: 13444
Place-ID: 2255

https://www.seilbahntechnik.net/en/lifts/13444/datas.htm