Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Ellmi's 6er

Valley Station
Valley Station

Mountain Station
Mountain Station

Mountain Station
Mountain Station

General information  
Place Ellmau 
resort ?? 
Region Tyrol 
Country   
Name of lift Ellmi's 6er 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date 2009 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1220 m
Height of mountain station 1521 m
Vertical rise 301 m
Route distance 1200 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 5,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 64 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 91 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/01/24
PHOTOS: ??

Lift-Statistics
23363 visit(s) since 18/09/09
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 14062
Place-ID: 74

https://www.seilbahntechnik.net/en/lifts/14062/datas.htm