Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Scuol - Motta Naluns












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Scuol
resort
Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift Scuol - Motta Naluns 
Type 8-MGD 
Lift manufacturer Garaventa 
Year of construction 2009 
Commissioning date ??

geometric data  
Height of valley station 1294 m
Height of mountain station 2150 m
Vertical rise 855,97 m
Route distance 2303 m
Horizontal length 2126,43 m
Average incline 40,25 %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,20 m
Trackwidth line 5,20 m
Trackwidth return 5,20 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 7,42 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 4676,79 m
Total weight of haul rope 56,10 t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) 1186 kW
Drive power (Operation) 944 kW
Brake power -1201 kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 86 Stk
Cab distance 61,70 m
Cab interval 10 s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/07/20 14:24:58
PHOTOS: 07/02/10 19:42:00

Lift-Statistics
4935 visit(s) since 17/09/09
Last visit 25/02/21

LIFT-WORLD IDs
Lift-ID: 14072
Place-ID: 2078

https://www.seilbahntechnik.net/en/lifts/14072/datas.htm