Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6/6-CGD Marmottes I










General information  
Place Alpe d'Huez 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Marmottes I 
Type 6/6-CGD 
Lift manufacturer Poma 
Year of construction 2009/21 
Commissioning date 2009 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Nothing

geometric data  
Height of valley station 1810 m
Height of mountain station 2338 m
Vertical rise 528 m
Route distance 2228 m
Horizontal length 2157 m
Average incline 24,4 %
Largest incline 66 %
Number of pillars 23 Stk
Greatest spanwidth 138 m
Max ground clearance 25 m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3028 Pers/h
Travel time 6,75 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1060 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-M 
Cab manufacturer Sigma 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater ?? 
Persons per cab 6/6 
Number of cabs 130 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 20 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Apr 20, 2024
PHOTOS: ??

Lift-Statistics
11041 visit(s) since Sep 24, 2009
Last visit May 11, 2025

LIFT-WORLD IDs
Lift-ID: 14122
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/14122/datas.htm