Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Medvědí hora

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Loučná nad Desnou 
resort Kouty nad Desnou 
Region Olomoucký kraj 
Country   
Name of lift Medvědí hora 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2009/10 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
The first 6-CLD in Czech republic!

geometric data  
Height of valley station 612,25 m
Height of mountain station 1097 m
Vertical rise 484,75 m
Route distance 1932,96 m
Horizontal length 1854,00 m
Average incline 26,15 %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 6,75 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 824 kW
Drive power (Operation) 632 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 120 Stk
Cab distance 33,75 m
Cab interval 6,75 s
Garage type emergency rail 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope 3919,40 m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 17 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27 août 2023
PHOTOS: ??

Lift-Statistics
3615 visit(s) since 27 sept. 2010
Last visit 16 juil. 2025

LIFT-WORLD IDs
Lift-ID: 14912
Place-ID: 1690

https://www.seilbahntechnik.net/en/lifts/14912/datas.htm