Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Hahnenkammbahn Höfen












Infos for handicapped persons
suitable

Characteristics
Half-sided middle station on the mountain route (only during the winter season in operation)!

General information  
Place Reutte
resort Hahnenkamm Höfen

Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hahnenkammbahn Höfen 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date 2010

geometric data  
Height of valley station 919,25 m
Height of middle station(s) 1519,75 m
Height of mountain station 1729,75 m
Vertical rise 810,5 m
Route distance 2559,27 m
Horizontal length 2450 m
Average incline 33,62 %
Largest incline 70,47 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,30 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 (2000) Pers/h
Travel time 7,5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 5118 m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1100 kW
Drive power (Operation) 900 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model ??
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 48 (69) Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 30/09/17 21:02:01
PHOTOS: 15/08/11 12:31:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8263 visit(s) since 23/10/10
Last visit 08/04/20

LIFT-WORLD IDs
Lift-ID: 14930
Place-ID: 26

https://www.seilbahntechnik.net/en/lifts/14930/datas.htm