Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD SINALCObahn (Hintermoos)












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Maria Alm
resort Hochkoenig

Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift SINALCObahn (Hintermoos) 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date ??

geometric data  
Height of valley station 896 m
Height of mountain station 1631 m
Vertical rise 735 m
Route distance 3520 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return 5,2 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 10,8 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system Siemens 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 705 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Carvatech
Cab model ULTRA 8 S
Seating leather
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 80 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ??
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) 11 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/05/20 21:13:10
PHOTOS: 12/12/10 22:21:00

Lift-Statistics
17490 visit(s) since 23/10/10
Last visit 19/09/20

LIFT-WORLD IDs
Lift-ID: 14934
Place-ID: 234

https://www.seilbahntechnik.net/en/lifts/14934/datas.htm