Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Maierlbahn










General information  
Place Kirchberg 
resort ?? 
Region Tyrol 
Country   
Name of lift Maierlbahn 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date 2010 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 885 m
Height of mountain station 1565 m
Vertical rise 680 m
Route distance 2713 m
Horizontal length 2616 m
Average incline 26 %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 7,32 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 1020 kW
Drive power (Operation) 804 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 68 Stk
Cab distance 90 m
Cab interval 15 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) B2 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/03/24
PHOTOS: ??

Lift-Statistics
23308 visit(s) since 23/10/10
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 14941
Place-ID: 55

https://www.seilbahntechnik.net/en/lifts/14941/datas.htm