  8-MGD Smaragd I










General information  
Place Bramberg am Wildkogel 
resort ?? 
Region Salzburg 
Country   
Name of lift Smaragd I 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date 2010 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 826 m
Height of mountain station 1624 m
Vertical rise 798 m
Route distance 2893 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 8,3 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 760 kW
Drive power (Operation) 646 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model DIAMOND - C8S210 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 75 Stk
Cab distance 86,4 m
Cab interval 14,4 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/03/20
PHOTOS: ??

Lift-Statistics
14349 visit(s) since 27/10/10
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 14952
Place-ID: 383

https://www.seilbahntechnik.net/en/lifts/14952/datas.htm