Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Nant Rouge



General information  
Place Les Contamines-Montjoie 
resort Les Contamines/​Hauteluce 
Region Rhône-Alpes 
Country   
Name of lift Nant Rouge 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1685 m
Height of middle station(s) ?? m
Height of mountain station 2123 m
Vertical rise 438 m
Route distance 1949 m
Horizontal length ?? m
Average incline 23 %
Largest incline 55 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time ?? min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 586 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-M 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 93 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16 feb 2025
PHOTOS: ??

Lift-Statistics
4323 visit(s) since 1 nov 2010
Last visit 10 giu 2025

LIFT-WORLD IDs
Lift-ID: 14984
Place-ID: 1102

https://www.seilbahntechnik.net/en/lifts/14984/datas.htm