Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Hochwurzen 2








Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Rohrmoos-Untertal
resort
Schladming Dachstein Tauern
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Hochwurzen 2 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1997 
Commissioning date ??

geometric data  
Height of valley station 1262 m
Height of mountain station 1849 m
Vertical rise 587 m
Route distance 1861 m
Horizontal length ?? m
Average incline ?? %
Largest incline 66,70 %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1685 Pers/h
Travel time 6,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 452 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 104
Cab manufacturer Doppelmayr
Cab model 4E95/B
Bubble colour
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 93 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ATS 
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/02/21 20:23:46
PHOTOS: 07/02/10 11:27:00

Lift-Statistics
10795 visit(s) since 15/01/03
Last visit 27/09/21

LIFT-WORLD IDs
Lift-ID: 1500
Place-ID: 527

https://www.seilbahntechnik.net/en/lifts/1500/datas.htm