Lift-Database » Lifts in the world
4/8-CGD Alpspitz-Kombibahn 2

General information | |
---|---|
Place | Nesselwang |
resort | ?? |
Region | Bavaria |
Country | ![]() |
Name of lift | Alpspitz-Kombibahn 2 |
Type | 4/8-CGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2010 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1188 m |
Height of mountain station | 1459 m |
Vertical rise | 271,39 m |
Route distance | 880,00 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 10 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 825 (1300) Pers/h |
Travel time | 3,63 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 400 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | OMEGA IV-8 LWI |
Bubble colour | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4/8 |
Number of cabs | 20 Stk |
Cab distance | 69,5 m |
Cab interval | 13,9 s |
Garage type | station circulation |
Garage place | valley station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | 11 t |
Haul rope diameter | 45 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 5 months |
Seasontime | ❄ ☀ all-season |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 14/03/23
PHOTOS: ??
Lift-Statistics
19301 visit(s) since 05/11/10
Last visit 10/12/23
LIFT-WORLD IDs
Lift-ID: 15006
Place-ID: 177
https://www.seilbahntechnik.net/en/lifts/15006/datas.htm
Datas: 14/03/23
PHOTOS: ??
Lift-Statistics
19301 visit(s) since 05/11/10
Last visit 10/12/23
LIFT-WORLD IDs
Lift-ID: 15006
Place-ID: 177
https://www.seilbahntechnik.net/en/lifts/15006/datas.htm