Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-FUTJ Dursey Island Cable Car

Station with complete route
Station with complete route

Route above Dursey Sound
Route above Dursey Sound

Inside the station
Inside the station

General information  
Place Dursey Island 
resort ?? 
Region Cork 
Country   
Name of lift Dursey Island Cable Car 
Type 6-FUTJ 
Lift manufacturer ?? 
Year of construction 1969 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
More info:
http://www.bearatourism.com/bwdursey.html

geometric data  
Height of valley station 22 m
Height of middle station(s) ?? m
Height of mountain station 22 m
Vertical rise ?? m
Route distance 360 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 2 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 6 Pers/h
Travel time 10 min
Driving speed line ?? m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 1 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Moving platform ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16 set 2012
PHOTOS: ??

Lift-Statistics
13408 visit(s) since 17 feb 2011
Last visit 10 mar 2026

LIFT-WORLD IDs
Lift-ID: 15154
Place-ID: 649

https://www.seilbahntechnik.net/en/lifts/15154/datas.htm