Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Alp Giop-Munt da San Murezzan












Infos for handicapped persons
Sorry, no information available.

Characteristics
to 2015 chairs with Bubbles

General information  
Place St. Moritz
resort
Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift Alp Giop-Munt da San Murezzan 
Type 4-CLD 
Lift manufacturer Garaventa 
Year of construction 1991 
Commissioning date ??

geometric data  
Height of valley station 2130,0 m
Height of middle station(s) ?? m
Height of mountain station 2688,50 m
Vertical rise 558,50 m
Route distance 2019,60 m
Horizontal length 1925,70 m
Average incline 28,50 %
Largest incline 68,60 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 6,80 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 4195 m
Total weight of haul rope 23,114 t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 4,0 m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 590 kW
Drive power (Operation) 460 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type AK 4.1
Cab manufacturer Garaventa
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 90 Stk
Cab distance 48 m
Cab interval 9,6 s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/12/15 17:29:52
PHOTOS: 08/02/10 18:28:00

Lift-Statistics
8368 visit(s) since 01/02/05
Last visit 17/09/21

LIFT-WORLD IDs
Lift-ID: 1529
Place-ID: 1726

https://www.seilbahntechnik.net/en/lifts/1529/datas.htm