Lift-Database » Lifts in the world
6-CLD/B Bürglalmbahn

Line

Line

Line
| General information | |
|---|---|
| Place | Dienten |
| resort | ?? |
| Region | Salzburg |
| Country | |
| Name of lift | Bürglalmbahn |
| Type | 6-CLD/B |
| Lift manufacturer | Doppelmayr |
| Year of construction | 2011 |
| Commissioning date | 12 / 2011 |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| The valley station will be relocated to the northern end of the village, where two ski bridges will span the two ditches, meaning that skiers will no longer need to take off their skis when crossing the Dientner Landesstraße road. With child safety features and orange bubbles. There is also a height-adjustable conveyor belt. |
| geometric data | |
|---|---|
| Height of valley station | 1075 m |
| Height of mountain station | 1652 m |
| Vertical rise | 577 m |
| Route distance | 1736 m |
| Horizontal length | ?? m |
| Average incline | ?? % |
| Largest incline | ?? % |
| Number of pillars | 15 Stk |
| Greatest spanwidth | ?? m |
| Max ground clearance | ?? m |
| Trackwidth drive | ?? m |
| Trackwidth line | ?? m |
| Trackwidth return | ?? m |
| Angle of wrap (drive wheel) | 180 ° |
| Drive altitude of site | ?? m |
| Maximum capacity | 1980 (2370) Pers/h |
| Travel time | 5,8 min |
| Driving speed line | 5,0 m/s |
| Driving speed station | ?? m/s |
| electrical data | |
|---|---|
| Electrical control | Siemens |
| Remote control and telemonitoring system | ?? |
| Power control system | Siemens |
| Number of drive | ?? Stk |
| Drive power (Start) | ?? kW |
| Drive power (Operation) | ?? kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Mountain station |
| Drive type | electrical |
| Traction of drive | electromechanical |
| Emergency drive | diesel engine |
| Traction of emergency drive | hydrostatic |
| cabins data | |
|---|---|
| Grip type | DT 108 |
| Cab manufacturer | Doppelmayr |
| Cab model | DCD 6 |
| Bubble colour | orange |
| Seating | leather |
| Seat heater | no |
| Persons per cab | 6 |
| Number of cabs | 70 (84) Stk |
| Cab distance | ?? m |
| Cab interval | ?? s |
| Garage type | ground floor |
| Garage place | mountain station |
| Garage direction | backward |
| Loading direction | forward |
| rope data | |
|---|---|
| Rope manufacturer | Fatzer |
| Length of haul rope | ?? m |
| Total weight of haul rope | ?? t |
| Haul rope diameter | 54 mm |
| Nominal strength of haul rope | ?? N/mm² |
| Breaking strength of rope | ?? kN |
| Tensionstation haulrope | Valley station |
| Tension type | hydraulical (controlled) |
| Tension way | ?? m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | ?? % |
| Drive direction | right |
| Construction costs | ?? EUR |
| Currency (Construction costs) | Euro |
| Construction period | 7 months |
| Seasontime | ❄ ☀ all-season |
| Situation of entrance | parallel |
| Situation of exit | parallel |
| Loading carpet | yes |
| Evacuation ropeway | no |
| Integrated rescue system | no |
| Rope position control | yes |
| Autonomous ropeway | no |
| Asset number (Trail map) | M |
Updates
Datas: 16 dic 2025
PHOTOS: ??
Lift-Statistics
23530 visit(s) since 30 nov 2011
Last visit 18 dic 2025
LIFT-WORLD IDs
Lift-ID: 15490
Place-ID: 232
https://www.seilbahntechnik.net/en/lifts/15490/datas.htm
Datas: 16 dic 2025
PHOTOS: ??
Lift-Statistics
23530 visit(s) since 30 nov 2011
Last visit 18 dic 2025
LIFT-WORLD IDs
Lift-ID: 15490
Place-ID: 232
https://www.seilbahntechnik.net/en/lifts/15490/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands

