Lift-Database » Lifts in the world
10-MGD Ried
Line
General information | |
---|---|
Place | Perch/Perca |
resort | Dolomiti Superski |
Region | Trentino-South Tyrol |
Country | |
Name of lift | Ried |
Type | 10-MGD |
Lift manufacturer | Leitner |
Year of construction | 2011 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
One-sided middle station (down) and drive-through operation with 10-MGD Gipfelbahn (2nd section), initial construction: 111 gondolas and 2310 p/h |
geometric data | |
---|---|
Height of valley station | 930,2 m |
Height of middle station(s) | 951,7 m |
Height of mountain station | 1733,22 m |
Vertical rise | 803,02 m |
Route distance | 4337,78 m |
Horizontal length | 4222,72 m |
Average incline | 20 % |
Largest incline | 68 % |
Number of pillars | 24 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 6,1 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2310 (3200) Pers/h |
Travel time | ?? min |
Driving speed line | 6,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Leitner |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 2 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 805 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | LPA-M |
Cab manufacturer | Sigma |
Cab model | DIAMOND - C10D210 |
Seating | leather |
Seat heater | yes |
Heater | no |
Aircon | no |
Persons per cab | 10 |
Number of cabs | 148 Stk |
Cab distance | 70,13 (54) m |
Cab interval | 11,69 (9) s |
Garage type | ground floor |
Garage place | valley station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 58 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | 5 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 08/09/24
PHOTOS: ??
Lift-Statistics
13264 visit(s) since 30/11/11
Last visit 22/12/24
LIFT-WORLD IDs
Lift-ID: 15505
Place-ID: 1514
https://www.seilbahntechnik.net/en/lifts/15505/datas.htm
Datas: 08/09/24
PHOTOS: ??
Lift-Statistics
13264 visit(s) since 30/11/11
Last visit 22/12/24
LIFT-WORLD IDs
Lift-ID: 15505
Place-ID: 1514
https://www.seilbahntechnik.net/en/lifts/15505/datas.htm