Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Mayentzet - Tête des Ruinettes










General information  
Place Verbier 
resort Les 4 Vallées 
Region Valais 
Country   
Name of lift Mayentzet - Tête des Ruinettes 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2011 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1736 m
Height of mountain station 2256 m
Vertical rise 520 m
Route distance 1371 m
Horizontal length ?? m
Average incline ?? %
Largest incline 79 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return 6,10 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,48 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A108 
Cab manufacturer Garaventa 
Cab model 6E98/B 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 48 Stk
Cab distance 45 m
Cab interval 9 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/04/23
PHOTOS: ??

Lift-Statistics
7731 visit(s) since 04/12/11
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 15545
Place-ID: 227

https://www.seilbahntechnik.net/en/lifts/15545/datas.htm