Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Pengelstein II








Rescue bridge
Rescue bridge


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Kirchberg
resort Kitzbuehel
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Pengelstein II 
Type 4-CLD/B 
Lift manufacturer Girak-Garaventa 
Year of construction 2000 
Commissioning date ??

geometric data  
Height of valley station 1319 m
Height of mountain station 1934 m
Vertical rise 565 m
Route distance 2171 m
Horizontal length ?? m
Average incline 27,10 %
Largest incline 54,70 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2040 Pers/h
Travel time 7,1 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 716 kW
Drive power (Operation) 573 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Girak-Garaventa
Cab model ??
Bubble colour
Seating leather
Seat heater no
Persons per cab
Number of cabs 129 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 25/02/13 20:52:00
PHOTOS: 01/02/05 22:15:27

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
16407 visit(s) since 22/11/02
Last visit 10/12/19

LIFT-WORLD IDs
Lift-ID: 1566
Place-ID: 55

https://www.seilbahntechnik.net/en/lifts/1566/datas.htm