Lift-Database » Lifts in the world
4-CLD Brunnenkopfbahn

Valley Station

Line

Mountain Station
| General information | |
|---|---|
| Place | Oetz |
| resort | Hochoetz |
| Region | Tyrol |
| Country | |
| Name of lift | Brunnenkopfbahn |
| Type | 4-CLD |
| Lift manufacturer | Doppelmayr |
| Year of construction | 2003 |
| Commissioning date | ?? |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| Bottom station length: UNI-G M Top station length: UNI-G S Sheave type 401. |
| geometric data | |
|---|---|
| Height of valley station | 1960 m |
| Height of mountain station | 2174 m |
| Vertical rise | 214 m |
| Route distance | 658 m |
| Horizontal length | ?? m |
| Average incline | 35 % |
| Largest incline | ?? % |
| Number of pillars | 10 Stk |
| Greatest spanwidth | ?? m |
| Max ground clearance | ?? m |
| Trackwidth drive | 5,20 m |
| Trackwidth line | 5,20 m |
| Trackwidth return | 5,20 m |
| Angle of wrap (drive wheel) | ?? ° |
| Drive altitude of site | ?? m |
| Maximum capacity | 2320 Pers/h |
| Travel time | 2,19 min |
| Driving speed line | 5,0 m/s |
| Driving speed station | ?? m/s |
| electrical data | |
|---|---|
| Electrical control | Elin |
| Remote control and telemonitoring system | ?? |
| Power control system | Elin |
| Number of drive | 1 Stk |
| Drive power (Start) | 315 kW |
| Drive power (Operation) | ?? kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Valley station |
| Drive type | electrical |
| Traction of drive | electromechanical |
| Emergency drive | ?? |
| Traction of emergency drive | ?? |
| cabins data | |
|---|---|
| Grip type | DT 104G |
| Cab manufacturer | Doppelmayr |
| Cab model | 4E98 |
| Seating | Icolan |
| Seat heater | no |
| Persons per cab | 4 |
| Number of cabs | 48 Stk |
| Cab distance | ?? m |
| Cab interval | ?? s |
| Garage type | station circulation |
| Garage place | valley and mountain |
| Garage direction | forward |
| Loading direction | forward |
| rope data | |
|---|---|
| Rope manufacturer | Teufelberger |
| Length of haul rope | 1400 m |
| Total weight of haul rope | 6,4 t |
| Haul rope diameter | 36 mm |
| Nominal strength of haul rope | ?? N/mm² |
| Breaking strength of rope | ?? kN |
| Tensionstation haulrope | Valley station |
| Tension type | hydraulical (controlled) |
| Tension way | ?? m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | ?? % |
| Drive direction | right |
| Construction costs | ?? |
| Currency (Construction costs) | ?? |
| Construction period | 3 months |
| Seasontime | ❄ winter |
| Situation of entrance | 90° |
| Situation of exit | parallel |
| Loading carpet | no |
| Evacuation ropeway | no |
| Integrated rescue system | no |
| Rope position control | ?? |
| Autonomous ropeway | no |
| Asset number (Trail map) | ?? |
Updates
Datas: 26.04.2022
PHOTOS: ??
Lift-Statistics
18812 visit(s) since 16.03.2003
Last visit 25.10.2025
LIFT-WORLD IDs
Lift-ID: 1575
Place-ID: 14
https://www.seilbahntechnik.net/en/lifts/1575/datas.htm
Datas: 26.04.2022
PHOTOS: ??
Lift-Statistics
18812 visit(s) since 16.03.2003
Last visit 25.10.2025
LIFT-WORLD IDs
Lift-ID: 1575
Place-ID: 14
https://www.seilbahntechnik.net/en/lifts/1575/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands
