Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Panoramabahn


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
New at winter 2009/10 seat-heater

General information  
Place Jerzens
resort Hochzeiger
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Panoramabahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date ??

geometric data  
Height of valley station 1802 m
Height of mountain station 2370 m
Vertical rise 568 m
Route distance 1404,94 m
Horizontal length ?? m
Average incline 44,20 %
Largest incline 69,81 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2755 Pers/h
Travel time 4,79 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 829 kW
Drive power (Operation) 676 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour
Seating leather
Seat heater yes
Persons per cab
Number of cabs 78 Stk
Cab distance ?? m
Cab interval 7,84 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ??
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/06/09 20:03:00
PHOTOS: 31/05/04 09:24:53

Lift-Statistics
12995 visit(s) since 21/01/03
Last visit 06/12/21

LIFT-WORLD IDs
Lift-ID: 1594
Place-ID: 139

https://www.seilbahntechnik.net/en/lifts/1594/datas.htm