Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Boè












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Corvara
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Boè 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2012 
Commissioning date 2012

geometric data  
Height of valley station 1541,4 m
Height of mountain station 2194,35 m
Vertical rise 653 m
Route distance 2641 m
Horizontal length 2521 m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 7 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1250 kW
Drive power (Operation) 960 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA-M
Cab manufacturer CWA
Cab model CONUS 8
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 104 Stk
Cab distance 57,6 m
Cab interval 9,6 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 01/09/17 20:54:22
PHOTOS: 25/12/12 21:03:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10691 visit(s) since 28/10/12
Last visit 12/11/19

LIFT-WORLD IDs
Lift-ID: 16012
Place-ID: 1383

https://www.seilbahntechnik.net/en/lifts/16012/datas.htm