Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Walde

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Kitzbuehel 
resort ?? 
Region Tyrol 
Country   
Name of lift Walde 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2012 
Commissioning date 2012 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1512 m
Height of mountain station 1706 m
Vertical rise 194 m
Route distance 473 m
Horizontal length ?? m
Average incline 45,25 %
Largest incline ?? %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2100 Pers/h
Travel time 1,35 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 240 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 23 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 3 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) A8 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/03/24
PHOTOS: ??

Lift-Statistics
16290 visit(s) since 28/10/12
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 16018
Place-ID: 51

https://www.seilbahntechnik.net/en/lifts/16018/datas.htm