Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Kreuzwiesn X-press










General information  
Place Zell am Ziller 
resort ?? 
Region Tyrol 
Country   
Name of lift Kreuzwiesn X-press 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2012 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1853 m
Height of mountain station 2161 m
Vertical rise 308,3 m
Route distance 1231,9 m
Horizontal length 1186,4 m
Average incline 26,0 %
Largest incline 61,8 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 4,1 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98/B 
Bubble colour orange 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 46 Stk
Cab distance 60,0 m
Cab interval 12,0 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 2524 m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 4 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/01/23
PHOTOS: ??

Lift-Statistics
19927 visit(s) since 31/10/12
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 16039
Place-ID: 64

https://www.seilbahntechnik.net/en/lifts/16039/datas.htm